Newbuilding

Name
Year
Description
140,000 GT LNG Cruise Ship
2018
Owner's naval architect. At order from Meyer Werfft.
Genting Global Class 200,000 GT ships
2018
Owner's consultant, under construction at MVW.
Saga Olympic
2018
Owner's consultant, under construction at Meyer Werft.
Foreship® Outline Project
2018
9,000 GT exploration cruise ship concept design
Foreship® Outline Project
2018
120,000 GT cruise ship concept design.
Foreship® Outline Project
2018
5,000 GT river cruise ship concept design.
Basic design of Polar Class Expedition Cruise Ship
2017
Classification design of Crystal Endeavor under construction at MVW.
Yacht Interior Basic Design
2017
U116 yacht interior basic design for Europlan.
AIDAperla
2017
Interior basic design for S.A. Svendsen.
Mein Schiff 3-6
2017
2013 - 2017 interior basic design of Main Theater and Klanghaus for Merima.
Foreship® ALS
2016
Foreship® ALS (air lubrication system) has been installed on six cruise ship new buildings so far. Foreship has carried out feasibility studies and system concept design in these projects. The work was carried out between the years 2013 and 2016.
Foreship® Outline Project
2016
Cruise Ship Newbuilding, ca. 55,000 GT for Saga Cruises, under construction at Meyer Werf.
Foreship® Outline Project
2016
Cruise Ship Newbuilding, ca. 16,500 GT for Scenic Cruises, under construction at Uljanik, Croatia
Foreship® Outline Project
2016
Cruise Ship Newbuilding, ca. 20,000 GT for Crystal Cruises, under construction at MVW
Foreship® Outline Project
2016
Cruise Ship Newbuilding, ca. 200,000 GT for Star Cruises, under construction at MVW
Floating Villa
2016
Interior detail design of floating villa for Admares.
Project Resolve - Asterix
2016
Deck house structural detail design and transport analysis for Almaco.
Foreship® Outline Project
2015
River Cruise Ship Newbuilding, ca. 3,000 GT for Crystal Cruises, delivered 2017 from MVW
WaveRoller
2015
Structural design and analysis for AW Energy.
Foreship® Outline Project
2014
Cruise Ship Newbuilding, ca. 8,000 GT for undisclosed client.
Foreship® Outline Project
2014
Cruise Ship Newbuilding, ca. 55,000 GT for undisclosed client.
Ferry concept design
2014
Ferry Newbuilding, ca. 1,500 lane meters for Rauma Marine Construction/Mols Linien, under construction at Rauma Marine Construction
Hull form optimization
2014
Hull form optimization of MSC Seaside.
Structural design
2014
Structural detail design of drill ship accommodation deck house for Almaco.
Quantum of the Seas
2014
AC-trunk detail design for Koja Marine.
Axis Offshore GM500 A
2014
Interior and electrical detail design of living quarters for Almaco.
5000 DWT EcoCoaster
2014
Concept design of energy efficient dry cargo carrier for Meriaura Group.
Backhop Dredger
2014
Basic design of BHD18000 for Wasa Dredging.
Foreship® Outline Project
2013
Cruise Ship Newbuilding, ca. 7,900 GT for undisclosed client.
Hull form optimization
2013
Hull form optimization of Harmony of the Seas and Symphony of the Seas.
Hull form optimization
2013
Hull form optimization of Seven Seas Explorer
Hull form optimization
2013
Hull form optimization of Seabourn Encore.
Hull form optimization
2012
Hull form optimiziation of Norwegian Escape an Norwegian Bliss.
Hull form optimization
2012
Hull form optimization of Carnival Vista
Hull form optimization
2011
Hull form optimization of Mein Shiff 3 & 4.
Hull form optimization
2010
Hull form optimization of Celebrity Reflection.
Hull form optimization
2010
Hull form optimization of Norwegian Breakaway & Getaway.
Hull form optimization
2010
Hull form optimization of Quantum of the Seas, Anthem of the Seas and Ovation of the Seas.
Hull form optimization
2009
Hull form optimization of Oasis of the Seas and Allure of the Sea.
Hull form optimization
2008
Hull form optimization of 128 000 GT Cruise Ships delivered from Meyer Werft 2012 and 2012